All former
dam sites on
Gluepot Reserve had been bulldozed in to reduce the number of feral animals that are attracted to this non natural water source. In order to direct water into the dams, drains were constructed up to a number of kilometres from the
dam sites and this collected water would gravity feed into the dams.